Thread: Concrete Mesh ~
View Single Post
Old February 21, 2006   #10
geoguy_TN
Tomatovillian™
 
geoguy_TN's Avatar
 
Join Date: Feb 2006
Location: Chattanooga, TN
Posts: 63
Default

My tip on the CRW cages: Don't just cut off the bottom circle. Make a cut at the intersection of the horizontal and vertical wire. Then bend that section of horizontal wire down so that it is vertical. You now have a 12" spike on the bottom. Do this around the entire bottom cirfumference.

Maybe everybody has figured this out already?
__________________
**Place clever signature here**
geoguy_TN is offline   Reply With Quote