Quote:
Originally Posted by amideutch View Post
The NEC was totally out the window when they installed that mess.

Ami
Not really, this is after they started tearing stuff out.
The armored MC cable is over used though because it is cheap and no one can run/bend conduit anymore.
Plus with all of the fancy electronics and data communication lines they have these days the ceilings are getting way full of stuff.
Plus run run run nobody has time to do a good looking job.
It really is sad.
If an OSHA inspector came on that site he would run off.
Worth