Quote:
Originally Posted by pecker88 View Post
everything I've read says to have the top of the concrete slightly below grade when setting chain link fence posts; prevents frost heaving. In the above drawing, the concrete footer is 4" below grade. I will also put bolts through the posts prior to setting them in concrete to prevent them from pulling up after the concrete sets.

I was thinking more on the lines of a catastrophic event such as the collapse of the structure.
This way you could start over without having a bunch of pipe or what ever stuck in concrete you couldn't do anything with.

To prevent frost heave pour the footings down below the frost line.
Worth
Worth1 is offline   Reply With Quote