View Single Post
Old April 16, 2016   #34
FourOaks
Tomatovillian™
 
Join Date: Mar 2016
Location: NC
Posts: 511
Default

As promised..

All of the bows have been bent and put in place, on 4 foot centers. I used 4 foot rebar pounded about 2 foot into the earth. I started installing 3/4 inch conduit to act as perlins, and support for hanging baskets. I purchased all the 3/4 inch I could find locally. I was surprised when places ran out of it. Must be quite popular.

The greenhouse has not been leveled up, so there are some low spots that make it look a little funky. I haven't installed hip boards, or the ground/foundation boards yet.

I had some leftover ground cover from GH #1. So I installed that, to get that started. Way back in the background you can see GH #1.
Attached Images
File Type: jpg 20160416_103623.jpg (682.5 KB, 61 views)
FourOaks is offline   Reply With Quote